Gold Member Since 2015
Audited Supplier
Devotion Machineries Co., Limited

Solid Fuel Steam Boiler, Mulit Fuel Steam Boiler, Energy Saving Steam Boiler manufacturer / supplier in China, offering Energy Saving Double Drum Biomass & Coal & Rice Husk Steam Boiler, Gas, Diesel, Heavy Oil, Dual Fuel Shell Steam Boiler, Electric Hot Water Boiler 233kw with Copper Heat Exchanger and so on.

(/ )

Supplier Homepage Product biomass/wood boiler automatic fuel feeding biomass/wood steam boiler Energy Saving Double Drum Biomass & Coal & Rice Husk Steam Boiler

Energy Saving Double Drum Biomass & Coal & Rice Husk Steam Boiler

FOB Price: US $38,000-228,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $38,000-228,000/ Set
Get Latest Price
Production Capacity: 20 Sets/Month
Transport Package: Stretch Film
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: SZL4~SZL20
  • Fuel: Biomass Pellet, Coal, Wood Chips, Palm Shell, etc
  • Structure: Combination of Fire Tube and Water Tube
  • Water Circulation: Forced Circulation
  • Pressure: Low Pressure
  • Burning Style: Layer Combustion (Fire Bed Combustion)
  • Rated Pressure: 1.25 MPa (12.5 Bar or 181 Psi) or 1.6MPa
  • Fuel Feeding: Automatic
  • Grate Type: Moving Grate
  • Origin: Guangzhou
  • Function: Steam Boilers
  • Installation: Packaged Boiler
  • Media: Steam
  • Drum Placement: Horizontal Boiler
  • Manufacturing Level: A
  • Usage: Industrial
  • Capacity: Around 280~1400 Bhp
  • Rated Steam Evaporation: 4~20 T/H
  • Specification: 4t/h - 20 t/h
  • HS Code: 84021900
Product Description
AUTOMATIC BI-DRUM CHAIN GRATE COAL FIRED STEAM BOILER 4-20 T/HR

-SZL series water tube steam boiler applies horizontal, bi-drum structure and special design   silo for optimizing fuel layering;
-Interlaced arranged convection bank tubes (unique design), improving heat convection;
-Unique diagonal bar design, more complete combustion;
-Special design of ash cleaning device, air pre-heater, economizer, water cooling furnace    door;
-Larger heating surface design, higher heat efficiency;
-Unique design of galvanized plate packing, more stable and sturdy;
-Utilizing chain grate, automatic fuel feeding;
-The best quality domestic fan, excellent valves, meters and pumps to guarantee boiler         steady operation.


DescriptionsEnergy-saving Bi-drum Water tube steam boiler Technical Data
SZL4-1.25-BMFSZL6-1.25-BMFSZL8-1.25-BMFSZL10-1.25-BMFSZL15-1.25-BMFSZL20-1.25-BMF
Rated Evaporationg(t/h)468101520
Working Pressure(Mpa)1.251.251.251.251.251.6
Water Feed temperature(ºC)2030606060105
Heating SurfaceBody(m2)93.7127153.2223.4355503.94
Effected Grate Area(m2)5.37.789.11217.720.25
Applicable FuelApplicable FuelBiamass pelletBiamass pelletBiamass pelletBiamass pelletBiamass pelletBiamass pellet
Low Heating Value(kj/kg)168301683016830168301683016830
Fuel con-sumptionBiomass pellet(kg/hr)~795~1100~1496~1796~2694~3592
Coal(kg/hr)~710~950~1250~1600~12450~3200
Boiler Effic-iency(%)Biomass pellet(kg/hr)828282.8882.18282
Coal818181818181
Max Piece Shipping Weight(t)~31~21~23~28~36~33
Max Dimensions affer installation7.4×2.6×3.58.0×2.7×5.578.6×2.7×5.579.61×3.2×5.5711.5×3.5×6.714×3.8×7.88
FD FanModelT4-72GG6-15GG8-15GG10-15GG15-15GG20-15
Air volume(m3/h)5380/102887000/100007000/1200014645/2079523812/2543535000/62000
Air pressure(Pa)1616/28522824/30992647/30992734/29993704/38122304/3138
Speed(r/min)145014501450145014501450
Capacity(kw)7.51115223755
Motor modelY132S1-2Y160M-4B3Y160M4-4B3Y180L-AB3Y225M-4B3Y255M-4B3
ID FanModelYX9-35GY6-15GY8-15GY10-15GY15-18GY20-18
Air volume(m3/h)8868/1934215756/1932015756/1932026321/3213837754/4645315756/19320
Air pressure(Pa)2805/30414057/41064106/40573714/38023800/39684690
Speed(r/min)160014501450145014501450
Capacity(kw)2237455575110
Motor modelY180L-4Y225S-4B3Y225S-4B3Y250M-AB3Y225S-4B3Y315S-4B3
Speed AdjusterModelGL5PL-80L-100AGL-16PGJ-200GJ-200
Capacity(kw)0.370.850.851.11.51.5



Energy Saving Double Drum Biomass & Coal & Rice Husk Steam Boiler
Energy Saving Double Drum Biomass & Coal & Rice Husk Steam Boiler
FAQ

Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.
Send your message to this supplier
Avatar
Mr. Richard Zhang
Manager
*From:
To: Mr. Richard Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category