Boiler Applications
-for plant process where steam demand is not big, e.g textile;
-for laundry, Kitchen,school, etc where quick and frequent steam is requested;
Product Features
This boiler is adopted of tubeless to prevent any tube explosion. With big water capacity, the boiler can tolerate more variants. Fully automatic, easy maintenance.
Introducing advanced technology, energy-saving, easy operation, fast start-up.
Equipped with European brand burner with functions like flame detection, control of air and fuel, etc.
High quality steam, the dryness is above 96%.
Multi-safety protections such as pressure, temperature, water level, etc.
Technical Data
Model |
LWS0.05 |
LWS0.08 |
LWS0.1 |
LWS0.15 |
Rated Evaporationg(kg/h) |
50 |
80 |
100 |
150 |
Heated area(m2) |
2.3 |
2.5 |
3.2 |
4.2 |
Rated steam pressure(Mpa) |
0.4 |
0.4 |
0.7 |
0.7 |
Rated steam temperature(ºC) |
152 |
152 |
170 |
170 |
Thermal efficiency of boilers(%) |
≥88 |
≥88 |
≥88 |
≥91 |
Adaptation of fuel |
Light diesel oil,Natural gas |
Fuel consumption |
Light diesel oil(kg/h) |
3.28 |
5.28 |
6.62 |
10 |
Heavy oil(kg/h) |
|
|
|
|
Natural gas(Nm3/H) |
3.87 |
6.2 |
7.81 |
11.7 |
Inlet valve calibert |
DN(mm) |
G1/2" |
G1/2" |
G1/2" |
G1/2" |
Steam outlett |
G1/2" |
G1/2" |
G3/4" |
G3/4" |
Blow-offvalve caliber |
40 |
40 |
40 |
40 |
Safety valve calibert |
G1/2" |
G11/2" |
G11/2" |
G11/2" |
Smoke extractor outlet(mm) |
|
Φ102 |
Φ102 |
Φ102 |
Φ140 |
Specification |
equipment weight(kg) |
420 |
480 |
660 |
740 |
length(mm) |
953 |
953 |
1120 |
1350 |
Width(mm) |
806 |
806 |
970 |
1030 |
Height(mm) |
1700 |
1850 |
1890 |
2000 |
FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.
Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.
Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.
Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.
Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.
Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.
Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.