6000L/H Gas/Oil/Dual Fuel Hot Water Boiler

Product Details
Customization: Available
Function: Hot Water Boiler
Fuel: Gas/Oil/Dual Fuel
Manufacturer/Factory, Trading Company
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
>2000 square meters
Find Similar Products

Basic Info.

Model NO.
CWNS0.35-60/10-Y(Q)
Structure
Fire Tube
Media
Hot Water
Water Circulation
Forced Circulation
Drum Placement
Horizontal Boiler
Pressure
No Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Capacity
350 Kw
Heat Output
300,000 Kcal/Hr
Applicable Capacity
3/380/50,3/440/60,3/220/60
Outlet Temperature
60 Degree C
Transport Package
Stretch Film & Wooden Cases
Specification
6000L/H
Trademark
Devotion
Origin
Guangzhou
HS Code
84031090
Production Capacity
100 Sets/Month

Product Description


Applications

Providing hygienic hot water for guestrooms in hotels, schools, hospitals, etc;
Providing hot water air conditioning heating for commercial buildings in cold areas;
Providing both functions with bi-coil built-in design;
Applicable for pressure system, especially for high buildings;

Shining points
- This product has synthesized the merits of atmospheric pressure boiler and pressure boiler;
-Patented technology: the body designed according to atmospheric pressure type and a built-in 1.0 Mpa pressure copper heat exchanger, effectively solved the problem of providing heating and clean hot water for top buildings;
-Bi-coil technology: providing hygienic water and hot water for different use in the same time;

The technical parameters of gas/oil/dual fuel hot water boiler with built-in copper heat exchanger
       Model
 
Data
CWNS
0.12
CWNS
0.17
CWNS
0.23
CWNS
0.35
CWNS
0.41
CWNS
0.47
CWNS
0.53
CWNS
0.58
CWNS
0.7
CWNS
0.93
CWNS
1.17
CWNS
1.4
CWNS
1.75
CWNS
2.1
CWNS
2.45
CWNS
2.8
Rated output X104 kcal/h 10 15 20 30 35 40 45 50 60 80 100 120 150 180 210 240
(kw) 116 175 232 350 400 465 526 581 700 920 1163 1400 1750 2100 2450 2800
Outlet/returen water temp(ºC) 60/50(air conditions heating)                       60/10 (hygienic hot water )
Applicable fuel Light oil /Heavy oil / Nature gas /LPG/city gas
Fuel
consumption
Light oil (Kg/h) 10.9 16.4 21.9 32.7 32.7 43 48.3 53.7 64.4 85.9 106.1 127.4 159.2 191 222.6 252
Heavyoil (Kg/h) 11.2 16.8 22.4 33.5 33.5 44 49.5 54.9 66.9 87.9 103.7 130.1 163 195.6 228 259.1
Natural gas
(Nm3 /h)
13.2 19.8 26.4 39.4 41.9 51.8 61.8 64.7 77.6 103.4 127.8 153.4 191.8 230.2 255.8 303.9
LPG(Nm3 /h) 4.7 7.1 9.4 13.6 13.6 18.3 20.6 22.9 27.5 36.6 45.3 54.3 67.9 81.5 95.1 107.5
 
City gas
(Nm3 /h)
29.6 44.3 59.1 88.2 88.2 115.7 130 144.6 173.5 231.3 286 343.2 429.1 514.9 606 679.2
Efficiency (%) 89 89 89 89.5 90 91 91 91 91 91 92 92 92 92 92 93
inlet/outlet water pressure drop 5 5 7 8 9 11 11 11 12 12 13 13 14 14 15 15
Power Electricity consumption (kw) 0.15 0.15 0.45 0.75 0.75 1.1 1.1 1.1 1.1 1.5 3 4 4 6 6 9
Voltage (V) 380/220                 50Hz
N.W (kg) 1264 1285 1491 2156 2278 2516 2820 3100 3138 3899 4101 5900 6200 7650 7750 8650
Water volume (m3 ) 0.58 0.58 2.28 2.51 2.80 3.31 3.31 3.31 4.35 5.92 6.31 7.34 7.73 7.83 7.85 9.82
Discharge of flue gas ((m3 ) 250 376 502 750 875 985 1125 1231 1476 1969 2432 2920 3450 4379 4850 5777
Pressure of flue gas (Pa) 40 48 80 100 110 130 135 140 150 180 210 230 250 310 315 320
 
 
 
 


FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier