Guangdong, China
Business Type:
Manufacturer/Factory, Trading Company
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001, ISO 14001
Main Markets:
South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Coal Steam Boiler, Biomass Steam Boiler, Wood Steam Boiler manufacturer / supplier in China, offering Packaged Steam Output 0.5~6 T/H Wood, Biomass, Coal Fired Steam Boiler, Packaged Coal, Biomass, Wood 0.5~10 T/H Steam Boiler, Fuel Biomass, Coal Automatic Chain Grate Steam Boiler and so on.

Gold Member Since 2015
Audited Supplier

Packaged Steam Output 0.5~6 T/H Wood, Biomass, Coal Fired Steam Boiler

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $18,000-68,000/ Set
Port: Huangpu, China
Production Capacity: 50 Sets/Month
Payment Terms: L/C, T/T
Function: Steam Boilers
Fuel: Multi Fuel (Almost All Types of Solid Fuels)
Installation: Packaged Boiler
Structure: Combination of Fire Tube and Water Tube
Media: Steam
Water Circulation: Natural Circulation

You Might Also Like


Basic Info

Model NO.: DZG0.5~DZG6
Drum Placement: Horizontal Boiler
Pressure: Low Pressure
Manufacturing Level: A
Burning Style: Layer Combustion (Fire Bed Combustion)
Usage: Industrial
Rated Pressure: 1.0MPa or 1.25 MPa Optional
Boiler Capacity: 70 Bhp~420 Bhp
Power Source: 3/380/50;3/440/60
Grate Type: Fix Grate
Fuel Feeding: Manually
Transport Package: Stretch Film & Wooden Cases
Specification: 1 t/h~6 t/h
Origin: Guangzhou
HS Code: 84021900

Product Description

Product Applications
·providing steam for industrial process 

Product Descriptions
  • fix grate design, applicable for burning almost all types of fuel;
  • horizontal water fire tube structure, longitudinal distributed three-pass, water cooling walls arranged at each side for heat radiation;
  • Unique distribution of long and short water tubes to facilitate combustion;
  • Secondary fan design to improve efficiency;
  • Water-cooling furnace door design to improve reliability and efficiency (national patent);
  • intelligent boiler controller with PLC and touch screen, easy for operation;

Technical Data

Rated Evaporationg(t/h)0.51246
Working Pressure(Mpa)0.711.251.25 
Water Feed temperature(ºC)2020202020
Heating SurfaceBody(m2)21.140.370123.2154
Effected Grate Area(m2)
Applicable FuelBMFBMF(Biamass Moulded Fuel),Coal,etc
Low Heating Value1683016830168301683016830
Fuel con-sumptionBiomass pellet(kg/hr)~100~200~395~795~1110
Boiler Effic-iency(%)Biomass pellet80.579.58080.280
Max Piece Shipping Weight(t)~7~10~21.5~27~36
Max Dimensions affer installation3.3×1.5×2.94.3×1.9×3.14.9×2.5×3.355.7×2.75×3.86.4×3.1×5.0
FD FanModelGG0.5-15GG1-15GG2-15GG4-15GG6-15
Air volume(m3/h)12002400/35002600/420072007000-10000
Air pressure(Pa)15081579/18342250/313833143099-2824
ID FanModelGY0.5-15GY1-15GY2-15GY4-15GY6-15
Air volume(m3/h)30003800/68005200/85001400015756-19320
Air pressure(Pa)29402373/29423020/366839204106-4057

Packaged Steam Output 0.5~6 T/H Wood, Biomass, Coal Fired Steam Boiler
Packaged Steam Output 0.5~6 T/H Wood, Biomass, Coal Fired Steam Boiler

Our customers
Packaged Steam Output 0.5~6 T/H Wood, Biomass, Coal Fired Steam Boiler


Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get fourteen months (14) warranty counting from the date of shipment or twelve (12) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 45-60 days for pressure boilers, and 30-50 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For solid fuel boiler bigger than 1 ton/hr can't be loaded into standard container, but we can ship it via bulk carrier or flat container.

Send your message to this supplier

avatar Mr. Richard Zhang

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now