• High Efficiency Electric Steam Boiler for Industrial Applications
  • High Efficiency Electric Steam Boiler for Industrial Applications
  • High Efficiency Electric Steam Boiler for Industrial Applications
  • High Efficiency Electric Steam Boiler for Industrial Applications
  • High Efficiency Electric Steam Boiler for Industrial Applications
  • High Efficiency Electric Steam Boiler for Industrial Applications

High Efficiency Electric Steam Boiler for Industrial Applications

Function: Steam Boilers
Fuel: Electric Heating
Installation: Packaged Boiler
Structure: Electric Heating Elements
Media: Steam
Water Circulation: Natural Circulation
Customization:
Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LDR0.3-0.7~LDR2.0-1.25
Drum Placement
Vertical Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Electricity Heating
Usage
Industrial and Commercial
Capacity
21bhp~140bhp
Steam Evaporation
300 Kg/H (0.3 T/H)~2000 Kg/H(2.0 T/H)
Rated Pressure
0.7MPa (7 Bar or 100 Psi) to 1.25MPa
Power Source
3/380/50,3/400/50
Control Panel
Separated
Transport Package
Stretch Film & Wooden Cases
Specification
300 kg/hr~2000 kg/hr
Origin
Guangzhou
HS Code
84021900
Production Capacity
30 Sets/Month

Product Description

Boiler Applications
-providing steam for factory process;
-providing steam for commercial applications;
-recommendation: for those areas where electricity cost is cheap;
 
Product Features
   -clean and high efficiency up to 99%;
   -competitive prices and less initial investment for boiler house;
   -control panel with PLC and touch screen with parameters setting function, fully   
     automatic operation;

   -fine quality and long life-span electric heating elements;

   -multi-level protections

Company & Workshop

High Efficiency Electric Steam Boiler for Industrial Applications
High Efficiency Electric Steam Boiler for Industrial Applications
High Efficiency Electric Steam Boiler for Industrial Applications


High Efficiency Electric Steam Boiler for Industrial Applications
FAQ

Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details.
Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.


 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now