Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner

Product Details
Customization: Available
Function: Steam Boilers
Fuel: Oil-Fired
Manufacturer/Factory, Trading Company
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
>2000 square meters
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
  • Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
Find Similar Products

Basic Info.

Model NO.
WNS0.5~WNS20
Installation
Packaged Boiler
Structure
Fire Tube
Media
Steam and Water
Water Circulation
Natural Circulation
Drum Placement
Horizontal Boiler
Pressure
Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Rated Working Ressure
1.0~1.6 MPa (10 Bar ~16bar)
Boiler Capacity
35~1400 Bhp
Rated Steam Output
500~20000 Kg/Hr
Electricity Specification
3/380/50, 3/400/60, 3/440/60, 3/220/60
Shell Material
GB713 Q245r, Equal to ASME SA 516
Fire Tube Material
GB3087 20, Equal Toasme SA210
Boiler Structure
Horizontal
Design
3 Pass, Wet Back, Fire Tube
Insulation
Aluminium Silicate Wool
Protective Cladding
Stainless or Aluminium Sheet
Transport Package
Stretch Film & Wooden Cases
Specification
0.5 t/h ~ 20 t/h
Trademark
Devotion
Origin
Guangzhou
HS Code
84021900
Production Capacity
100 Sets/Month

Product Description

Production Applications
-providing steam for industrial applications
-providing hot water through heat exchanger
-providing steam and hot water for commercial applications like hotel, hospital, etc

Technical Datasheet
WNS Series Main Technical Paramters of Horizontal Gas/Oil/Dual fuel Steam Boiler (3 pass, wet back, fire tube)            
   Model                                                                 Data
WNS0.5 WNS1 WNS1.5 WNS2 WNS3 WNS4 WNS5 WNS6 WNS8 WNS10 WNS15 WNS20
Thermal capacity(BHP) 35 70 105 140 210 280 350 420 560 700 1050  
Rated steam evaporation(t/hr) 0.5 1 1.5 2 3 4 5 6 8 10 15 20
Rated steam pressure(Mpa) 0.7/1.0/1.25
Rated water supply(ºC) 20                                                                          105
Applicable fuel light oil/diesel oil/heavy oil/furnace oil/natual gas/LPG/city gas/dual fuel  
Fuel consumption (no economizer) light oil/diesel(kg/hr) 34 68 103 124.2 186.3 248.4 310 350.2 467 586 879.3 1175
heavy oil(kg/hr) 34.8 69.7 105.5 127.2 190.8 254.4 317 358.6 478 600 900 1203
Natural gas(Nm3/hr) 40.6 81.9 124.1 149.6 224.4 299.3 373 421.9 563 706 1059 1416
LPG(Nm3/hr) 14.5 29 44 53 79.5 106 132 149.4 199 250 375 501
City gas(Nm3/hr) 91.6 183 277.7 334.7 502 669.4 835 994 1258 1579 2369 3166
Thermal efficiency% (not incl economizer/incl.economizer) 90(90) 90(94) 90(94) 90(94) 90(94) 90.6(94.1) 90.8(94.2) 90.7(94.2) 91(94.3) 91.1(94.6) 91(94.6) 91.3(94.6)
Electricity consumption heavy oil(kw) 6.67 7.4 13.6 19.2 23.6 26.2 27.7 39.9 46.1 58 86.5 112
other fuel(kw) 2.05 2.5 4.8 6.2 10.5 13 17.5 19.5 21.5 32 45 60
Voltage applicable 3/380/50(standard); 3/440/60;3/220/60;3/400/60 (optional)
Heating surface (m2) (not incl. economizer) 12.9 26.6 49.2 51.3 75.9 96 132.4 138.8 179.1 234.4    
Wate volume(m3) 1.5 4.5 5.3 5.5 6.3 7.8 8.7 9.1 12.7 20.4 28.7 41.4
Net weight(kg) 2.9 5.3 6.8 6.9 9.8 11.2 13.1 14.9 21.5 26.1 34.8 52.8
Dimensions(mm) 3064*2173*1694 3319*2565*2156 3661*2660*2484 3791*2660*2484 4340*2860*2880 5090*2860*2880 5291*2930*2916 5491*3065*2916 6090*3460*3218 6790*3460*3418 8400*4180*3840 8980*4430*3900
Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner


Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner
Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner

Heavy Oil/Mazut/Bunker Oil Fired Steam Boiler with EU Burner


FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier