• Instant Steam Generating Boiler
  • Instant Steam Generating Boiler
  • Instant Steam Generating Boiler
  • Instant Steam Generating Boiler
  • Instant Steam Generating Boiler
  • Instant Steam Generating Boiler

Instant Steam Generating Boiler

Function: Steam Boilers
Fuel: Gas/Oil/Dual Fuel
Installation: Packaged Boiler
Structure: Tubeless
Media: Steam
Water Circulation: Natural Circulation
Customization:

Contact Supplier

Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LWS0.05~LWS0.15
Drum Placement
Vertical Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Cyclone Furnace
Usage
Industrial
Output
50~150 Kg/Hr
Rated Pressure
0.4 MPa (4 Bar or 60 Psi)~0.7MPa
Applicable Fuel
Gas, Oil, Dual Fuel
Electricity Specification
3/380/50,1/220/50, 1/220/60
Heat Efficiency
>88%
Transport Package
Wooden Case
Specification
50~150 kg/h
Origin
Guangzhou
HS Code
84021900
Production Capacity
100 Sets/Month

Product Description

Boiler Applications
-for plant process where steam demand is not big, e.g textile;
-for laundry or Kitchen;

Product Features
This boiler is adopted of tubeless to prevent any tube explosion. With big water capacity, the boiler can tolerate more variants. Fully automatic, easy maintenance.
Introducing advanced technology, energy-saving, easy operation, fast start-up.
Equipped with European brand burner with functions like flame detection, control of air and fuel, etc.
High quality steam, the dryness is above 96%.
Multi-safety protections such as pressure, temperature, water level, etc.

Technical Data
Model LWS0.05 LWS0.08 LWS0.1 LWS0.15
Rated Evaporationg(kg/h) 50 80 100 150
Heated area(m2) 2.3 2.5 3.2 4.2
Rated steam pressure(Mpa) 0.4 0.4 0.7 0.7
Rated steam temperature(ºC) 152 152 170 170
Thermal efficiency of boilers(%) ≥88 ≥88 ≥88 ≥91
Adaptation of fuel Light diesel oil,Natural gas
Fuel consumption Light diesel oil(kg/h) 3.28 5.28 6.62 10
Heavy oil(kg/h)        
Natural gas(Nm3/H) 3.87 6.2 7.81 11.7
Inlet valve calibert DN(mm) G1/2" G1/2" G1/2" G1/2"
Steam outlett G1/2" G1/2" G3/4" G3/4"
Blow-offvalve caliber 40 40 40 40
Safety valve calibert G1/2" G11/2" G11/2" G11/2"
Smoke extractor outlet(mm)   Φ102 Φ102 Φ102 Φ140
Specification equipment weight(kg) 420 480 660 740
length(mm) 953 953 1120 1350
Width(mm) 806 806 970 1030
Height(mm) 1700 1850 1890 2000


FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.

Send your message to this supplier

*From:
*To:
avatar Mr. Richard Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now