• High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
  • High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
  • High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
  • High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
  • High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger

High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger

Function: Hot Water Boiler
Fuel: Gas/Oil/Dual Fuel
Installation: Packaged Boiler
Structure: Fire Tube
Media: Hot Water
Water Circulation: Natural Circulation
Customization:

Contact Supplier

Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
CWNS0.7-60/10(50)-Y(Q)
Drum Placement
Horizontal Boiler
Pressure
No Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Capacity
700 Kw
Heat Output
600,000 Kcal/Hr
Flow Rate
12000 L/H
Outlet Temperature
60 Deg C
Allowable Pressure for Heat Exchanger
1.0MPa
Transport Package
Stretch Film & Wooden Cases
Specification
600000 kcal/h
Trademark
Devotion
Origin
Guangzhou
HS Code
84031090
Production Capacity
100 Sets/Month

Product Description


Applications
  • Providing hygienic hot water for guestrooms in hotels, schools, hospitals, etc;
  • Providing hot water air conditioning heating for commercial buildings in cold areas;
  • Providing both functions with bi-coil built-in design;
  • Applicable for pressure system, especially for high buildings;
Shining points
- This product has synthesized the merits of atmospheric pressure boiler and pressure boiler;
-Patented technology: the body designed according to atmospheric pressure type and
 a built-in 1.0 Mpa pressure copper heat exchanger, effectively solved the problem of
  providing heating and clean hot water for top buildings;
-Bi-coil technology: providing hygienic water and hot water for different use in the
  same time;
High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
High-Tech 700kw Hot Water Boiler with Copper Heat Exchanger
FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.

Send your message to this supplier

*From:
*To:
avatar Mr. Richard Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now