Product Description
Fully Premixted Condensing Modular Hot Water Model: DSMK-99
Thermal capacity: 99KW (84,180 Kcal) Flow rate: 67 L/Min under ΔT=20ºC
Fuel consumption: 9.4 Nm3/hr for natural gas
Max efficiency: 108%
Dimensions(L*W*H): 650mm*500mm*1160mm Shipping weight: 118 kgs Features:
-compact structure, less installation area -fully premixed combustion system - multi level heat exchange & condensing technology
-stainless & finned tubes for heat exchanger -intelligent control panel & multi level safety protection
FRQ
Q1: Where is your company?
A1: We used to locate in Guangzhou , but was moved to Changzhou in 2019, but headquarters of Devotion group is still located in Guangzhou.
Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.
Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or online assistance. However, our service team members also are available for travelling upon request from customers.
Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for atmospheric-pressure boilers. For non-standard products, time will be different and subject to the specifications of pressure, electricity, fuel, capacity, etc.
Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.
Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.
Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container. Frame rack (flat) container or bulk carrier will be applied.