Guangdong, China
Business Type:
Manufacturer/Factory, Trading Company
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001, ISO 14001
Main Markets:
South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

ASME Steam Boiler, ASME Boiler, ASME Industrial Boiler manufacturer / supplier in China, offering ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner, Fuel Gas, Oil Thermal Oil Boiler with European Burner, Fuel Gas/Oil/Dual Fuel Packaged Thermal Oil Boiler and so on.

Gold Member Since 2015
Audited Supplier

ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $150,000-220,000/ Set
Port: Shenzhen, China
Production Capacity: 50 Sets/Month
Payment Terms: L/C, T/T, Western Union, Money Gram
Function: Steam Boilers
Fuel: Gas/Oil/Dual Fuel
Installation: Packaged Boiler
Structure: Fire Tube
Media: Steam and Water
Water Circulation: Natural Circulation

You Might Also Like

Loading...

Basic Info

Model NO.: WNS10
Drum Placement: Horizontal Boiler
Pressure: Pressure
Manufacturing Level: A
Burning Style: Chamber Combustion Boiler
Usage: Industrial
Rated Working Ressure: 12.5~16 MPa (12.5 Bar ~16 Bar)
Boiler Capacity: 700 Bhp
Boiler Structure: Horizontal
Electricity Specification: 3/380/50, 3/400/60, 3/440/60, 3/220/60
Construction Code: ASME
Trademark: Devotion
Transport Package: Stretch Film & Wooden Cases
Specification: 8 t/h or 8000 kg/hr
Origin: Guangzhou
HS Code: 84021900

Product Description

ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner

ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner
ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner
ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner
Our customers
ASME 10 Ton Gas/Oil/Dual Fuel Steam Boiler with European Burner

FAQ

Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container, frame rack (flat) container or bulk carrier is applicable.

Send your message to this supplier

*From:
*To:
avatar Mr. Richard Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now